Time to bend and install the ribs (called frames in real ships). These are 3/32" square cherry stock. To bend them, I immersed them in boiling water for 5 minutes. They can be handled with your bare hands almost immediately after pulling them out of the water. One end of the rib is put in the socket on the keel, then slowly, slowly bent along the mold, then clipped down. It took me about three minutes to slowly bend each frame.
Sunday, October 9, 2011
Cooking Ribs
Time to bend and install the ribs (called frames in real ships). These are 3/32" square cherry stock. To bend them, I immersed them in boiling water for 5 minutes. They can be handled with your bare hands almost immediately after pulling them out of the water. One end of the rib is put in the socket on the keel, then slowly, slowly bent along the mold, then clipped down. It took me about three minutes to slowly bend each frame.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment